Site Electrical Ltd was contracted to provide the full mechanical and electrical engineering content of a new surface water pumping station. |
![]() |
| Download | |
|
|
![]() Barton Square is the £79 million extension to the Trafford Centre; Site Electrical was awarded the complete mechanical and electrical scope for the pumping stations by Jim Ennis Construction Ltd. The surface water pumping station was designed for a one in one hundred year storm and has a three pump arrangement. |
|
| Download | |
|
|
|
|
|
| Download | |
|
|
|
DCT Civil Engineering with Site Electrical as a strategic partner were contracted by United Utilities to build a Pumped Detention Tank at Mab Lane to address DG5 flooding issues. |
|
| Download | |
|
|
|
|
|
| Download |

Site Electrical Case Study