Site Electrical Ltd - Case Studies, Specialist mechanical, electrical and control panel engineering for waste water treatment and sewage flow.

magglass.jpgSite Electrical Case Study
Airbus UK 2008

  

Airbus UK Site Electrical Case Study

 

Site Electrical Ltd was contracted to provide the full mechanical and electrical engineering content of a new surface water pumping station.

AirbusPDF_1.jpg
  Download

magglass.jpgSite Electrical Case Study
Barton Shopping Complex 2008

 
bartonsquare_copy.jpg
Barton Square is the £79 million extension to the Trafford Centre; Site Electrical was awarded the complete mechanical and electrical scope for the pumping stations by Jim Ennis Construction Ltd. The surface water pumping station was designed for a one in one hundred year storm and has a three pump arrangement.
BartonSqr_1.jpg 
  Download

magglass.jpgSite Electrical Case Study
Killingholme 2010

 

Killingholme_copy.jpg   
Site Electrical were contracted by ABS Pumps to install new submersible pumps in 3 pumping stations at Centrica’s Power Station at Killingholme on Humberside. The planned outage, which lasted only 17 days, included the removal of the existing Weir pumps and the full M&E installation of the new ABS pumps.

Killingholme.jpg 
  Download

magglass.jpgSite Electrical Case Study
Mab Lane 2010

 

MabLane_1.jpg

 

DCT Civil Engineering with Site Electrical as a strategic partner were contracted by United Utilities to build a Pumped Detention Tank at Mab Lane to address DG5 flooding issues.

MabLanepdf.jpg 
  Download

magglass.jpgSite Electrical Case Study
West Burton Power Station 2010

 

westburton.jpg


EDF Energy’s new 1,300MW Combined Cycle Gas Turbine (CCGT) power station at West Burton.  Site Electrical Ltd were contracted to provide the mechanical and electrical engineering content of the cooling water pumping station.  

WestBurtonpdf.jpg 
  Download